L
Lift Line and Halfpipe Cases (Ski Resort and Snow Park)
Connector test assembly: drive terminal, 12 m span, chairlift tower, 12 m span, gondola tower, 6 m span and return terminal aligned on the 8 m cable datum with a chair and a gondola hanging; beside it a two-row halfpipe run of left wall, tile and right wall joined by slope...
CC0 — free for any use, no attribution required
- Type
- 3D model
- Category
- Environments
- Triangles
- 7.4k
- Style
- Low Poly
- Format
- GLB
- Size
- 320 KB
- License
- CC0
- Source
- Collected by EarthOnline