D
Demolition site mid clearance with plant working the face (Demolition and Site Clearance)
A controlled demolition and site clearance 36 m by 24 m, hoarded, damped down and mid job. Solid hoarding runs across the front and down the left boundary with the gate on the haul road, the wheel wash and the banksman's post inside it, the signage frame and the cone and...
CC0 — free for any use, no attribution required
- Type
- 3D model
- Category
- Environments
- Triangles
- 44k
- Style
- Realistic
- Format
- GLB
- Size
- 2.0 MB
- License
- CC0
- Source
- Collected by EarthOnline