D
Demolition wall section, down to rubble (Demolition and Site Clearance)
The same 4 m bay after the wall is down: a 500 mm stub of brickwork on the footing with the broken face showing, a heap of graded masonry rubble across the bay and two lengths of bent rebar lying in it, ready for the loader.
modernrealisticmodularexterior
CC0 — free for any use, no attribution required
- Type
- 3D model
- Category
- Buildings
- Triangles
- 612
- Style
- Realistic
- Format
- GLB
- Size
- 78 KB
- License
- CC0
- Source
- Collected by EarthOnline